I was offered a well-paid role to crank out HEC-RAS models and Section 404 paperwork for a mitigation bank that leans on riprap and channelization. I’m wrestling with whether taking it undermines the restoration ethos I teach interns on the Skagit. How have you balanced a paycheck with steering work toward process-based, nature-based restoration so every project leaves the river more alive than we found it?